Signal's Training Centre at Kamalapur.


Construction of Double Line Track from Tongi to Bhairab Bazar including Signalling on Dhaka-Chittagong Main Line.










BILL OF QUANTITIES











Bill No. 5 - Subsection D: Stations and Buildings









Name of works:  Signal's Training Centre at Kamalapur, Dhaka, Bangladesh.








PART-1 CIVIL WORKS



SL No BOQ No Description of Works   Unit Quantity
1 D-1.7(a) Concrete Class-15 in Foundation. Cu m 1.20
2 D-1.7(c) Concrete Class-25 with 12mm Doungraded course aggregate. Cu m 0.60
3 D-1.9(a) Brick work with 1:4 Cement morter Cu m 1.84
4 D-1.10 Patent Stone Flooring   Sq m 95.94
5 D-1.11 In-Situ Mosaic work   Sq m 78.12
6 D-1.12 Ceramic Floor Tiles   Sq m 9.15
7 D-1.13 Ceramic wall Tiles   Sq m 32.12
8 D-1.14(a) Cement Plaster to RCC surface(1:4) Sq m 12.00
9 D-1.14(b) Cement Plaster to Brick Masonry(1:5) Sq m 52.32
10 D-1.15(a) Enamel Paint to door shutter & frame Sq m 12.60
11 D-1.15(b) Enamel Painting to window & veranda grill. Sq m 31.25
12 D-1.15(c) Plastic Paint   Sq m 155.48
13 D-1.15(d) Snowcem Painting   Sq m 6.51
14 D-1.16(a) Wooden Door Shutter   Sq m 4.20
15 D-1.16(b) Wooden Door Frame   Cu m 0.12
16 D-1.19(a) M S Grill   Sq m 7.35
17 D-1.19© Collapsible gate   Sq m 4.20
18 D-1.20 Plastic door with with Chowkat(uPVC) nr 1.00
19 D-1.21(a) Aluminium fixed window.   Sq m 7.66
20 D-1.21(b) Aluminium sliding door and window.   Sq m 6.72
21 D-1.21© Aluminium fixed louver   Sq m 3.50
22 D-1.26 Mild Steel angle, C-Channel, Column, Beam and Plate. Tonne 1.25
PART-2 SANITARY AND WATER SUPPLY        
Sl No BOQ No Description of Works   Unit Quantity
23 D-2.1(a) Water Closet, Long Pan. 570mmx445mmx290mm nr 1.00
24 D-2.1(b) Water Closet, European Type. 465mmx340mmx415mm nr 1.00
25 D-2.2 Wash Basin, Wall Mounted,White Glazed Vitreous China, 580mmx445mmx235mm.   nr 1.00
26 D-2.3(a) Estern Type/Squanting Urinal   nr 1.00
27 D-2.3(b) Western Type/Standing Urinal, Wall mounted, 490mmx312mmx292 nr 1.00
28 D-2.4 Kitchen Sink, Stainless Steel, Single Bowl 1050mmx450mm nr 1.00
29 D-2.5 Soap Tray, Porcelain, Wall Mounted, 150mmx110mmx40mm nr 2.00
30 D-2.6 Toilet Paper Holder,Porcelain, Wall Mounted, 150mmx150mmx125mm nr 1.00
31 D-2.7 Glass Shelf,  Wall Mounted, 600mmx125mmx5mm nr 1.00
32 D-2.8 CP Towel Rail,   Wall Mounted, 60mmx20mm diameter nr 1.00
33 D-2.9 Mirror, Unframed, Wall Mounted, 450mmx350mmx5mm nr 1.00
34 D-2.10 CP Bip Cock,Heavy Type Faucet, 12mm diameter nr 3.00
35 D-2.11 CP Stop Cock,Heavy Type Faucet, 12mm diameter nr 3.00
36 D-2.12© Gate Valve, Heavy Type, 25mm diameter nr 1.00
37 D-2.12(d) Gate Valve, Heavy Type, 20mm diameter nr 1.00
38 D-2.13(a) Galvanized Iron(GI) Water Pipe, 13mm diameter. Lin m 30.48
39 D-2.13(b) Galvanized Iron(GI) Water Pipe, 20mm diameter. Lin m 15.24
40 D-2.13© Galvanized Iron(GI) Water Pipe, 25mm diameter. Lin m 7.25
41 D-2.14(a) PVC Rain Water, Soil, Waste and Sewrage Pipe 50mm diameterx3.7-4.3mm wall thickness. Lin m 4.57
42 D-2.14(b) PVC Rain Water, Soil, Waste and Sewrage Pipe 100mm diameterx3.4-4.0mm wall thickness. Lin m 15.24
43 D-2.15© Inspection Chambers with RCC Cover, Size 300mmx300mmx600mm. nr 1.00
PART-3 ELECTRICAL WORKS        
SL No BOQ No Description of Works   Unit Quantity
44 D-3.1(a) Concealed Point Wiring, Light Point. nr 10.00
45 D-3.1(b) Concealed Point Wiring, Fan Point. nr 6.00
46 D-3.1© Concealed Point Wiring, Call Bell Point with Bell Push (Instead of Switch)  nr 1.00
47 D-3.2(a) Concealed Circuit/Power Point Wiring, 1C-2 x 2.5 sq mm Cable with 2.5 sq mm, ECC Wire thru 16mm diameter PVC Lin m 22.86
48 D-3.2(b) Concealed Circuit/Power Point Wiring, 1C-2 x 4.0 sq mm Cable with 4.0 sq mm, ECC Wire thru 20mm diameter PVC Lin m 11.50
49 D-3.3© 1C-4 x 10 sq mm Cable with 1C-1 x 10 sq mm, ECC Wire. Lin m 15.24
50 D-3.5 Signalling System   nr 1.00
51 D-3.6(a) Galvanized Iron (GI) Works, 19mm nominal ID Lin m 15.25
52 D-3.7(a) 250V, Single Phase, 3-Pin, 15A combined, Switch and Socket outlet. nr 3.00
53 D-3.7(b) 250V Single Phase, 1-Gang 3-Pin 13A , Combined Switch and Socket Outlet. nr                 2.00
54 D-3.7© 250V, 5A, 2-Pin Concealed Type Socket  nr 5.00
55 D-3.7(d) One-Gang Switch   nr 10.00
56 D-3.7(e) Two-Gang Switch   nr 5.00
57 D-3.7(f) Three-Gang Switch   nr 3.00
58 D-3.8 Ceiling Fan, AC Capacitor Type, 1422.4mm Sweep  nr 4.00
59 D-3.9 Exhaust Fan, AC Capacitor Type 1, Wall, Mounted, 457mm. nr 2.00
60 D-3.10(a) SDB-1, Box Size 750mm x 600mm x 150mm, Incoming: 1 x up to 63A TP MCCB, Outgoing: 3-Nos. 20-40A TP MCB, 17-Nos. 10-32A SP MCB Busbar Size up to 150A TPN & E nr 1.00
61 D-3.10(d) MDB-1, Box Size 750mm x 600mm x 150mm Incoming: 1 up to 50A TP MCCB, Outgoing:   4-Nos. 40A SP MCB, 3-Nos. 10A SP MCB, Busbar Size up to 150A TPN & E nr 1.00
62 D-3.10(f) Distribution Board 250V Grade with 6-32A SP MCB nr 1.00
63 D-3.10(g) Distribution Board 250V Grade with TP MCB nr 1.00
64 D-3.11(a) Fancy Single Bracket Light Fitting nr 3.00
65 D-3.11© 2-4' x 40 Watt Fluorescent Tube nr 10.00
66 D-3.11(d) Bathroom Light Fitting   nr 3.00
67 D-3.11(f) 40/60 Watt Lamp    nr 3.00
68 D-3.11(g) 100 Watt Lamp   nr 12.00
69 D-3.11(h) 4' x 40 Watt Fluorescent Lamp    nr 10.00
70 D-3.13 Earthing for Lightning Protection per Station nr 1.00
71 D-3.14 Earth Inspection Pit, 600mm x 600mm with 250mm thick Brick in Cement Mortar (1:4) and 100mm thick RCC Top Slab. nr 1.00
72 D-3.15 Energy Metre, 415V, 50Hz, 3-Phase, 4-Wire40, 100A (kWh Metre) nr 1
73 D-3.16  Load Sanktion from Dessa/Desco/Reb with complete connection nr 1.00
74 D-3.17 Teliphone System   nr 1.00

Wednesday 23 2014

Mechanics of Solids ||



MECHANICS OF SOLIDS ІІ

CE 604

Tensional Stresses in shafts and rubes:
Helical Springs:

Spring :

http://upload.wikimedia.org/wikipedia/commons/thumb/d/d5/Springs_009.jpg/200px-Springs_009.jpg

Helical or coil springs designed for tension.
http://upload.wikimedia.org/wikipedia/commons/thumb/2/2a/Ressort_de_compression.jpg/200px-Ressort_de_compression.jpg

Sunday 20 2014

Ema Razzak




Dear Mr. Razzak,

Please include following statement in the forwarding letter you will use while submitting drawings to Consultant:

***********************************************************************
                                                                                                                     
Kindly be informed that due to unavailability of American AISC Standard Hot Rolled WF & C - Sections in the market, we have proposed substitutes against the same. All substitute sections proposed are also Hot Rolled Sections but of a different standard, which are available in nearby countries / regions.

To support our case further we have attached the following:

Annex 1 - Summary Chart of all substitutions proposed
Annex 2 - AISC relevant pages containing data on the cross sections under consideration
Annex 3 - Corresponding data for substituted members
Annex 4 - Corresponding data for substituted Channel

You will surely find that in almost every case we have proposed Rolled Sections which are "higher", i.e. structural more conservative than the original AISC section given. Only in the instance of item # 4 of Annex 1, the original AISC beam is "higher" in size. However, please note the difference is considerably small and also this section is being used only in two stations out of eleven total.

Therefore, in light of the above, we hope to justify our use of these proposed sections and would be tremendously grateful to your esteemed offices, if your engineers could be kind enough to accept the same. 







Dear Mr. Razzak,
I have read consultant's letter dated 21st May 2014 and the only relevant points to reply against are in Point # 1 - Dwgs No. 004 & 008. Please send the attachment in my earlier mail to the consultant when sending.
Our replies are as follows:

***********************************************************************

Drawing No. 004

The Main Girder section as per on Consultant's drawings, for all but two sites, is the W27 x 84 AISC section. Now, we have checked this beam and chosen the French Hot Rolled Section HEAA 700 or WPB 700 x 300 x 150 kg/m as a substitute. However, please note this is a serial designation of the beam. Actual size is as shown in Annex 1. 

There, one can easily check that our proposed size is in fact, "higher", i.e. structural more conservative than the original AISC section given, whether it is Moment of Inertia, Gross Cross-Sectional Areas, Flange Compactness, Minor Axis Inertia, Section Moduli, etc.

To make comparison easier, we have given a list of the most important structural physical properties of the cross section. Our chart in Annex 1 shows this comparison for each proposed size against its original AISC design size.


Drawing No. 008

The Intermediate & End Columns are both given as W21 x 122 AISC sections. In this case we have chosen the French Hot Rolled Section HEB 600 or WPB 600 x 300 x 212 kg/m beam as substitute. Again, as above, the actual size is as shown in Annex 1. Also in this case, one shall find, our proposed size, despite having flange width less by 14.3mm, is being structurally more superior in terms of cross-sectional properties. 

Here our request to your esteemed office is to re-consider the design parameters, in conjunction with assessing the supporting documents provided herewith, upon which we believe you shall find our sections suitable.

In general, kindly be informed that it is only due to unavailability of American AISC Standard Hot Rolled WF & C - Sections in the market, that we have proposed substitutes against the same. All substitute sections proposed are also Hot Rolled Sections but of a different standard, which are available in nearby countries / regions. 

To support our case further we have attached the following:

Annex 1 - Summary Chart of all substitutions proposed
Annex 2 - AISC relevant pages containing data on the cross sections under consideration
Annex 3 - Corresponding data for substituted members
Annex 4 - Corresponding data for substituted Channel


Therefore, in light of the above, we hope to justify our use of these proposed sections and would be tremendously grateful to your esteemed offices, if your engineers could be kind enough to accept the same. 

***********************************************************************

Thursday 06 2014

Your Secrecy

লজ্জা:

mdjZvq wbwl× 20wU kã 20| j¾v : j¾v bvixi f‚lY, আমি GKRb bvgx `vgx †jvK ZvB j¾v RbK KvR Aek¨B Avcwb Ki‡eb bv| c„w_exi †jvK †hb Rv‡b Avcwb ...