https://www.emarazzak.blogspot.com

Wednesday, January 14, 2015

Information of some rail Foot steel over bridge on Tongi to Bhairab Bazar Rail Line.


Toma  Construction and Company Limited



TONGI - BHAIRAB BAZAR DOUBLE LINE PROJECT
(Foot Over Bridge Information)









SL No. Station Name Station Code  Platform to PL Height in mm Total Span Length in mm Clear Height from Rail Top in mm Name of  Engineer-in-Charge(Toma) Total Sheets Work Position
1 Daulatkhandi DLY 300 31310 7300 Engr M A  Razzak 10 Drawing Approved
2 Srinidhi SRNI 300 32265 7300 Engr M A  Razzak 10 Drawing Approved
3 Methikanda MEY 300 30990 7300 Engr M A  Razzak 10 Drawing Approved
4 Hatubhanga HTGA 300 7300 Engr M A  Razzak Under Dicision
5 Khanabari KQC 300 32510 7300 Engr M A  Razzak 10 Drawing Approved
6 Amirgonj AMRG 300 31410 7300 Engr M A  Razzak 10 Drawing Approved
7 Narshigndi NRC 300 7300 Engr M A  Razzak Under Dicision
8 Jinardi JYD 300 30882 7300 Engr M A  Razzak 10 Drawing Approved
9 Arikhola AKH 300 33320 7300 Engr M A  Razzak 10 Drawing Approved
10 Pubail  PBY 300 30684 7300 Engr M A  Razzak 10 Drawing Approved





































Prepared By















Engr M A Razzak






14.01.2015






Sunday, November 30, 2014

Real Estate Page-13

13


KwZcq Riæix m~Î t

(1) AvqZ †ÿ‡Îi †LÎdj           = ‰`N©¨ x cÖ¯’|
(2) wÎfz‡Ri †ÿÎdj                = nvd x f~wgxD”PZv|
(3 )eM©‡ÿ‡Îi †ÿÎdj              = evû x evû|
(4) i¤^‡mi †ÿÎdj                  = ½ x KY© x KY©
(5) UªwcwRqv‡gi †ÿÎdj            = ½ x mgvšÍivj eûi       †hvMdj x Dnv‡`i j¤^`~iZ¡
(6) e„‡Ëi †ÿÎdj                   = πD²⁄4 = πr²
(7) AvqZvKvi  Nbe¯‘i AvqZb     =  ‰`N©¨ x cÖ¯’ x D”PZv
(8) wmwjÛv‡ii AvqZb              = πr²h
(9) †Kv‡Yi AvqZb                   = ¹⁄3 πr²h
(10) †Mvj‡Ki AqZb                = ¾ πr³h

ixq¨vj& Gm&†UU& A¨vÛ& Kb&÷&ªvK&kb&                              BwÄwbqvi Gg G iv¾vK wgTv


Tuesday, November 18, 2014

Success 1st page

Your SuccessmdjZv jv‡fi †Mvcb inm¨
mdjZvi 30wU †Mvcb kã
mdjZv jv‡fi †Mvcb inm¨
mdjZvi 30wU †Mvcb kã

1| fvjt  me mgq ÔfvjÕ kãwU D”PviY Ki‡Z n‡e|
2| Zzwgt Avgvi Avgvi fvlv ev` w`‡q me mgq ÔZzwgÕ fvlvwU D”PviY Ki‡Z n‡e| A_©vr wb‡Ri K_v D”PviY bv K‡i A‡b¨i fvj K_v Zv‡`i mvg‡b ej‡Z n‡e|
3| gvZv-wcvZt gvZv- wcZvi K_v me©`v g‡b ivL‡Z n‡e|
4| gvbyl t mb¥y‡Li gvby‡li K_v wPšÍv Ki‡Z n‡e|
5| UvKv t UvKvi K_v g‡b ivL‡Z n‡e|
6| e¨envi t Avcbvi e¨envi Aek¨B fvj n‡Z n‡e|
7| wkÿvt b¨vq-Ab¨vq eySvi gZ wkÿv Avcbvi _vK‡Z n‡e|
8| ¯^v¯’¨ t Avcbv‡K ¯^v¯’¨ m‡PZb n‡Z n‡e|
9| mgq t mgq Ávb Avcbvi Aek¨B _vK‡Z n‡e|
10| KvR t cÖwZwU gvbyl‡K Aek¨B KvR Ki‡Z n‡e|
11| wek¦vm t Ôwek¦vmÕ gvby‡li Kv‡Ri cÖavb nvwZqvi|
12| jÿ¨ t †h †Kvb Kv‡Ri jÿ¨ I D‡Ïk¨ _vK‡Z n‡e|
13| mdjZv t mdj bv nIqv ch©šÍ †h †Kvb KvR Pvwj‡q †h‡Z n‡e|
14| mvgvwRK t cÖwZwU gvbyl‡K mvgvwRKZv iÿv Ki‡Z n‡e|
15| ÿgZv t ÔÿgZvÕ Avcbvi Aek¨B Av‡Q Ges Zvnv mgqgZ LvU‡Z n‡e|
16| fvjevmv t mKj KvR I gvby‡li cÖwZ Avcbvi fvjevmv _vK‡Z n‡e|
17| nvwm t Avgv‡`i‡K me mgq `yt‡Li K_v e¨ZxZ mKj K_v nvwm gy‡L ej‡Z n‡e|
18| a¨vb t Ava¨vwZK welq g‡b ivL‡Z n‡e Ges †h †Kvb KwVbmgm¨vi Rb¨ Mfxi iv‡Z A_ev wbwiwewj a¨v‡b em‡Z n‡e ev a¨vb Ki‡Z n‡e|
19| wbivcËv t mKj Kv‡Ri Av‡M ÒwbivcËviÓ K_v g‡b ivL‡Z n‡e|
20| wek¦vm t †h †Kvb KvR‡K gb †_‡K wek¦vm Ki‡Z n‡e| †Kvb gvbyl A_ev KvR‡K wek¦vm bv Ki‡j Zvnv ïy Kiv hv‡e bv|
21| nu¨v t me wKQz‡K nu¨v m~PK (Positive)  g‡bvfv‡e wPšÍv Ki‡Z n‡e| KLbI bv-‡evaK wPšÍv Kiv hv‡e bv|
22| fvet wkÿv A‡cÿv GwU Pzf gvby‡li Rxe‡bi Rb¨ eû¸Y †ekx KvR K‡i| wkÿv ZvK‡j B›UviwfD †`Iqv hvqÕ Avi GwUPzf fvj _vK‡j PvKzwi cvIqv hvq Ges PvKzwi wU‡K _v‡K|
23| AR©bt †h †Kvb Kv‡Ri djvdj ev mdjZv Aek¨B fvj n‡Z n‡e|
24| gbt gvby‡li ÔgbÕ GKwU Ab¨Zg e¯‘| memgq gb fvj _vK‡Z n‡e Ges Kv‡Ri cÖwZ g‡bv‡hvM _vK‡Z n‡e|
25| †hvMv‡hvMt mdjZvi Rb¨ wjqv‡Rv ev †hvMv‡hvM GKwU cÖavb e¨cvi| †hvMv‡hvM _vK‡j m¤úK© fvj _vK‡e Ges m¤úK© fvj n‡j mdjZv Avm‡e|
26| m¤úK©t fvj m¤úK© gvby‡li Rxe‡bi mdjZvi g~j Pvwe KvwV| hvi hZ †ekx †jv‡Ki mv‡_ fvj m¤úK© _vK‡e †m e¨w³ Rxe‡b ZZ eo n‡e|
27| e³…Zvt e³…Zv ev gy‡Li K_v mdjZvi †giæ`Û| †h e¨w³i gy‡Li K_v hZ †KŠkj hy³ gayi †m e¨w³ c„w_ex‡Z ZZ eo n‡e|
28| ZK© I hyw³t ZK© I hyw³ w`‡q hZ †ekx †RZv hv‡e eÜzi msL¨v ZZ Kg‡Z _vK‡e| ZvB ZK© I hyw³ †_‡K weiZ _vKvB mdjZvi Ab¨Zg m~Î|
29| †KŠkjt †KŠkj Aej¤^b Kiv mdjZvi cÖavb m~Î| †KŠkj Qvov †hgb bvwi‡Kj Mv‡Q DVv hvq bv; †KŠkj Qvov †ZgbB DbœwZ Kiv hvq bv| ZvB mdjZvi Rb¨ †KŠk‡j K_v ej‡Z n‡e Ges KvR Ki‡Z n‡e|
30| weavZvt †h †Kvb Kv‡R m„wó KZ©vi bvg ¯^iY ivL‡Z n‡e| m„wó KZ©v‡K ¯^iY _vK‡j †h †Kvb Kv‡R mdjZv Av‡m|

Thursday, November 13, 2014

Real Estate-12

12
KwZcq AwZwi³ m~Î
 †gwUªK c×wZ †_‡K dzU c×wZ
 1 wgUvi                  =          3.28                    dzU
1 wK‡jvwgUvi             =       3280.83                 dzU
1 eM©wgUvi              =        10.764           eM©dzU
1 †nKUi                =        10000         eM©wgUvi
1 eM© wK.wg.             =          0.386        eM©gvBj
1 wKDweKwgUvi         =        35.315         wKDweK dzU
1 wjUvi                 =         0.22              M¨vjb
1 KzB›Uvj               =          2.68                gY
1 †KwR                  =         2.204            cvDÛ
 1 KzB›Uvj               =          100                 †KwR
1 †KwR/wgUvi           =        0.672        cvDÛ/dzU
1 †KwR/eM©‡m.wg.       =       14.28        wc,Gm,AvB
1 Gg,wc,G               =   145.038          wc,Gm,AvB
1 †KwR/eM©wgUvi         =      0.205        cvDÛ/eM©dzU
1 †KwR/wKDweK wgUvi   =     0.062         cvDÛ/NbdzU
1 ‡nKUi                  =      2.471                  GKi
1 wgUvi                    =      3.281                   dzU





ixq¨vj& Gm&†UU& A¨vÛ& Kb&÷&ªvK&kb&                              BwÄwbqvi Gg G iv¾vK wgTv

Wednesday, November 12, 2014

Real Estate Page-11

11
 KwZcq cÖ‡qvRbxq myÎ t
 dzU c×wZ †_‡K †gwUªK c×wZ
1 Bw              =         2.54                  ‡mw›UwgUvi
1 dzU               =       30.48                  ‡mw›UwgUvi
1 gvBj             =         1.61                   wK‡jvwgUvi
1 GKi             =        4840                        eM©MR
1 eM©gvBj          =         640                          GKi
1 NbdzU            =       0.0283               wKDweKwgUvi
1 M¨vjb            =        4.545                         wjUvi
1 †mi              =        0.933                         †KwR
1 gY               =      37.324                         †KwR
1 cvDÛ            =        0.454                         †KwR
1 n›`i             =           50                          †KwR
1 Ub                =        1.016                     †gwUªKUb
1 cvDÛ/dzU       =         1.480                  †KwR/wgUvi
1 wcGmAvB       =         0.070             †KwR/eM©†m.wg.
1 cvDÛ/eM©dzU    =         4.882             ‡KwR/eM©wgUvi
1 cvDÛ/NbdzU    =       16.080                †KwR/wK.wg.
1 GKi            =         0.4047                   †nKUi
1 dzU              =         0.3048                      wgUvi


xq¨vj& Gm&†UU& A¨vÛ& Kb&÷&ªvK&kb&                              BwÄwbqvi Gg G iv¾vK wgTv

Saturday, November 8, 2014

BOQ of Signal's Training Center Kamalapur Railway Station

TENDER DOCUMENTS 1
Construction of Double Line Track from Tongi to Bhairab Bazar including Signalling on Dhaka-Chittagong Main Line.
BILL OF QUANTITIES
Bill No. 5 - Subsection D: Stations and Buildings
Name of works:  Signal's Training Centre at Kamalapur, Dhaka, Bangladesh.
PART-1 CIVIL WORKS
SL No BOQ No Description of Works Unit Quantity Rate Amount
1 D-1.7(a) Concrete Class-15 in Toilet Platform Cu m 0.42 16140.00 6778.80
2 D-1.7(b) Concrete Class-25 with 12mm Doungraded course aggregate. Cu m 0.15 14129.00 2119.35
3 D-1.8 Steel Reinforcing Bars Tonne 0.40 92772.00 37108.80
4 D-1.9(a) Brick work with 1:4 Cement morter Cu m 0.65 2009.00 1305.85
5 D-1.10 Patent Stone Flooring Sq m 145.34 2073.00 301289.82
6 D-1.11 In-Situ Mosaic work Sq m 148.18 882.00 130694.76
7 D-1.12 Ceramic Floor Tiles Sq m 9.15 1181.00 10806.15
8 D-1.13 Ceramic wall Tiles Sq m 24.26 1092.00 26491.92
9 D-1.14(b) Cement Plaster to Brick Masonry(1:5) Sq m 333.42 222.00 74019.24
10 D-1.15(a) Enamel Paint to door shutter & frame Sq m 18.43 95.00 1750.85
11 D-1.15(b) Enamel Painting to window & veranda grill. Sq m 20.07 82.00 1645.74
12 D-1.15(c) Plastic Paint Sq m 557.62 71.00 39591.02
13 D-1.16(a) Wooden Door Shutter Sq m 3.81 1253.00 4773.93
14 D-1.16(b) Wooden Door Frame Cu m 0.16 18797.00 2932.33
15 D-1.19(a) M S Grill Sq m 7.43 865.00 6426.95
16 D-1.21(b) Aluminium sliding door and window. Sq m 7.43 3646.00 27089.78
Civil works total Taka 674825.29
PART-2 SANITARY AND WATER SUPPLY
Sl No BOQ No Description of Works Unit Quantity Rate Amount
17 D-2.1(b) Water Closet, European Type. 465mmx340mmx415mm nr 1.00 22981.00 22981.00
18 D-2.2 Wash Basin, Wall Mounted,White Glazed Vitreous China, 580mmx445mmx235mm.   nr 1.00 6966.00 6966.00
19 D-2.3(b) Western Type/Standing Urinal, Wall mounted, 490mmx312mmx292 nr 1.00 11739.00 11739.00
20 D-2.5 Soap Tray, Porcelain, Wall Mounted, 150mmx110mmx40mm nr 2.00 3753.00 7506.00
21 D-2.6 Toilet Paper Holder,Porcelain, Wall Mounted, 150mmx150mmx125mm nr 2.00 938.00 1876.00
22 D-2.7 Glass Shelf,  Wall Mounted, 600mmx125mmx5mm nr 1.00 1038.00 1038.00
23 D-2.8 CP Towel Rail,   Wall Mounted, 60mmx20mm diameter nr 2.00 1501.00 3002.00
24 D-2.9 Mirror, Unframed, Wall Mounted, 450mmx350mmx5mm nr 1.00 313.00 313.00
25 D-2.10 CP Bip Cock,Heavy Type Faucet, 12mm diameter nr 4.00 139.00 556.00
26 D-2.11 CP Stop Cock,Heavy Type Faucet, 12mm diameter nr 4.00 2461.00 9844.00
27 D-2.12© Gate Valve, Heavy Type, 25mm diameter nr 4.00 466.00 1864.00
28 D-2.13(a) Galvanized Iron(GI) Water Pipe, 13mm diameter. Lin m 18.29 392.00 7169.68
29 D-2.14(b) PVC Rain Water, Soil, Waste and Sewrage Pipe 100mm diameterx3.4-4.0mm wall thickness. Lin m 22.63 603.00 13645.89
30 D-2.15( c) Inspection Pit nr 1.00 54716.00 54716.00
Sanitary works toka 143216.57
2
Electrical works total taka
31 BOQ No Description of Works Unit Quantity Rate Amount
32 D-3.1(a) Concealed Point Wiring, Light Point. nr 8.00 100.00 800.00
33 D-3.1(b) Concealed Point Wiring, Fan Point. nr 4.00 100.00 400.00
34 D-3.2(a) Concealed Circuit Power Point Wiring, 1C x 2.5 sq mm Cable with 2.5 sq mm ECC wire thru 16 mm diameter PVC Pipe. Lin m 100.00 318.00 31800.00
35 D-3.2(b) Concealed Circuit Power Point Wiring, 1Cx2.4 sq mm Cable with 2.5 sq mm ECC wire thru 16mm diameter PVC Pipe. Lin m 100.00 318.00 31800.00
36 D-3.2(c) Concealed Circuit Power Point Wiring, 1Cx2.6 sq mm Cable with 2.5 sq mm ECC wire thru 16mm diameter PVC Pipe. Lin m 30.00 318.00 9540.00
37 D-3.3(b) 1C-1 x 6 sq mm Cable with 1C-1 x 6 sq mm, ECC Wire. Lin m 200.00 343.00 68600.00
38 D-3.3© 1C-4 x 10 sq mm Cable with 1C-1 x 10 sq mm, ECC Wire. Lin m 106.59 726.00 77384.34
39 D-3.3(d) 1C-4 x 16 sq mm Cable with 1C-1 x 16 sq mm, ECC Wire. Lin m 40.00 916.00 36640.00
40 D-3.5 Signalling System nr 1.00 56265.00 56265.00
41 D-3.6(a) 19mm GI Pipe Lin m 15.25 971.00 14807.75
42 D-3.7(a) 250V, Single Phase, 3-Pin, 15A combined, Switch and Socket outlet. nr 3.00 530.00 1590.00
43 D-3.7(b) 250V Single Phase, 1-Gang 3-Pin 13A , Combined Switch and Socket Outlet. nr 4.00 1590.00 6360.00
44 D-3.7© 250V, 5A, 2-Pin Concealed Type Socket  nr 4.00 530.00 2120.00
45 D-3.7(e) Two-Gang Switch nr 5.00 169.00 845.00
46 D-3.7(f) Three- Gang Switch nr 3.00 189.00 567.00
47 D-3.8 Ceiling Fan, AC Capacitor Type, 1422.4mm Sweep  nr 4.00 3415.00 13660.00
48 D-3.9 Exhaust Fan nr 2.00 3101.00 6202.00
49 D-3.10(c) SDB-1, Box Size 750mm x 600mm x 150mm, Incoming: 1 x up to 63A TP MCCB, Outgoing: 3-Nos. 20-40A TP MCB, 17-Nos. 10-32A SP MCB Busbar Size up to 150A TPN & E nr 2.00 677.00 1354.00
50 D-3.10(d) MDB-1, Box Size 750mm x 600mm x 150mm Incoming: 1 up to 50A TP MCCB, Outgoing:   4-Nos. 40A SP MCB, 3-Nos. 10A SP MCB, Busbar Size up to 150A TPN & E nr 1.00 971.00 971.00
51 D-3.10(f) 6-32A CP MCB Circuit Breaker nr 1.00 2251.00 2251.00
52 D-3.10(g) TP MCB nr 1.00 4621.00 4621.00
53 D-3.11(a) Fency Breaker Light nr 3.00 15331.00 45993.00
54 D-3.11(d) Bathroom Light Fitting nr 2.00 510.00 1020.00
55 D-3.11(f) 40/60/ watt Lamp nr 3.00 2552.00 7656.00
56 D-3.11(g) 100 Watt lamp nr 5.00 4641.00 23205.00
57 D-3.11(h) 40 watt tube light nr 4.00 1076.00 4304.00
58 D-3.11(i) 22 watt tube light nr 10.00 2478.00 24780.00
59 D-3.11(j) 30 watt tube light nr 10.00 2478.00 24780.00
60 D-3.13 Earthing for Lightning Protection per Station nr 1.00 9983.00 9983.00
61 D-3.14 Earth Inspection Pit, 600mm x 600mm with 250mm thick Brick in Cement Mortar (1:4) and 100mm thick RCC Top Slab. nr 1.00 113.00 113.00
62 D-3.15 Energy Meter nr 1.00 4330.00 4330.00
63 D-3.16  Load Sanction from Dessa/Desco/Reb with complete connection nr 1.00 1600.00 1600.00
64 D-3.17 Telephone System nr 1.00 283982.00 283982.00
Electrical works total taka= 800324.09
3
Part-4 Non Tender works
SL No BOQ No Description of Works Unit Quantity Rate Amount
65 Dismantling of 125mm Existing brick wall Brick wall. Sq m 8.36 938.00 7841.68
66 Dismantling of Existing Door. nr 2.00 1500.00 3000.00
67 Dismantiling of Existing Window. nr 3.00 950.00 2850.00
68 Cleaning, Cutting, Repairing & Polishing of Existing mosaic. Sq m 45.17 1350.00 60979.50
69 Dismantling of Plaster Sq m 446.00 75.00 33450.00
70 Dismantling of Existing of Patent stone Sq m 126.00 215.00 27090.00
71 S/F/F of Air Conditioner(2 tons) nr 2.00 300000.00 600000.00
72 Electric connection of Air-conditioner nr 2.00 5000.00 10000.00
Non tender works total Taka= 745211.18
Summary of BOQ
Part-1 Civil works total Taka                                                                    = 674825.29
Part-2 Sanitary works total Taka                                                            = 143216.57
Part-3 Electrical works total taka                                                           = 800324.09
Part-4 Non-Tender works Total Taka                                                    = 745211.18
Grand Total Taka(Part-1+Part-2+Part-3+Part-4)                                                  = 2363577.13
Prepared By
Engr M A Razzak
Site-in-Charge

Your Secrecy